Case Study
Stamped Parts Cleaning for a Polish Stamping Company
A high-volume stamping company removed drawing oil and fines with a rotary-basket line before plating.
View case study
LENJEX Project Record
A fastener manufacturer removed heading oil and fines in a continuous mesh-belt line before plating.
Project Context
The manufacturer produced bolts and nuts in high volume and needed forming oils and fines removed ahead of plating and packaging.
Before LENJEX
High-volume bulk loads and rust risk required a continuous, integrated process.

Cleaning Solution
The mesh-belt line conveyed parts through ultrasonic wash, rinse and drying with filtration, rust protection and automatic handling.
The line was sized to the required throughput and part size.
Project Outcomes
Performance depends on the workpiece, contamination, chemistry, loading method and acceptance criteria.
Related Case Studies
Case Study
A high-volume stamping company removed drawing oil and fines with a rotary-basket line before plating.
View case study
Case Study
Single-tank 28 KHz systems replaced solvent degreasing for bearing rings and rolling elements in Samara, Russia.
View case study
Case Study
An aluminum die-casting plant removed release agent and machining oil with alloy-safe heated cleaning.
View case study